Model Number: TOP-008-09
Brand Name: TOPWELL
Key Specifications/Special Features:
Product name: IML/IMD, in mold label, in mold decorationMould shaping: Plastic injection moldPlasticmaterial: PET, PC, PC+PET, ABS and PMMAColor: As your requirementApplicable to: Household, company, marketingMouldlife: 500, 000 shots
Certificate: ISO9001, ISO14001, TS16949, ISO13485
Process of IML craftwork:
IML molding:
Summary:
Specialties:
Packaging details:
Producing capability:
- First, PETprinting
- Second, hot forming
- Third, molding
- Opening mould &put in thin mould
- Closing mould &injection molding &film attached
- Opening mould &component demoulding
- Before mould building: Our teams will evaluate your part design to give you the DFM report, such us cooling, venting, gating, cavity/core sticking, short shot, shrinkage, Thin steel conditions, etc. Also our engineers will assist in improving the part design and optimizing the mold design to save your cost
- During mould building: We build the DME and Hasco standard mould as customers require, and we will provide you the steel certificate and heat treatment certificate. We will send you the progress report with digital photos every week to keep you updated. The most important is that we will give you the good T1 samples on time
- Mould approval: We will modify the mold until getting your approval on the samples, and we will invite you to attend the mould trial or send you mold test video
- RD&MD design
- Prototyping
- Plastic injection mould
- Double shot plastic
- Overmold
- IML/IMD
- Rubber injection molding
- AL/Zinc die casting mold
- Metal stamping dies (Punching tool, trimming dies)
- Thermoforming
- Moldflow analysis
- Plastic/metal product producing
- Assembly
- Silk Screening
- Anodize treatment
- Laser etching
- Painting
- E-Plating
- Ultrasonic welding
- Material selection
- SMT assembly line
- For mould: First, Assemble and clear mold; Second, The mold coated fog or grease and PE fresh-keeping film wrapped; Third, put the mold and the mold files(such as, injection machine date, steel material certification) into stable wooden carton; Third, seal the carton with nails
- For products: First, wrapped each part up with semi-transparent thin foam and put it into plastic bag; Second, put them into cartons with thin sponge plates to prevent scratches
- We have an excellent team of specialists and undergraduates and advanced engineers. R&am
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 7 - 20 days
Main Export Markets:
- Australasia
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe